Villa Arito Entry

From WikiArquitectura - Buildings of the World

Jump to:navigation, search


EN OBA 1.jpg


Villa Arito Entry
VillaArito Final Silueta Techo.jpg
Architect: Guillermo Carone
Year(s) of construction: 2004
Height: 7 m700 cm
7,000 mm
7.655 yd
22.966 ft
0.007 km
Length: 20.5 m2,050 cm
20,500 mm
22.419 yd
67.257 ft
0.0205 km
Location: Sitges, Barcelona, Spain
Coordinates: 41.24124494713161° N, 1.8240898847579956° ELatitude: 41°14′28.482″N
Longitude: 1°49′26.724″E

See on the Map
Adjust the marker

Google Logo.jpg

Most parts of this article have been translated using the Google automatic translate engine.

Please excuse any mistakes this translation might have and feel free to correct them if you wish to collaborate with our project.


Contents

Introduction

The project involved the creation of a new wall and entrance for pedestrians and vehicles to a house built in 1986 in the urbanization of La Levantina in the town of Sitges 36km from Barcelona.

At the time when the house was built it was surrounded by rural land used for growing vines and the population density was very low so that vehicles are parked in the house against her in the street. Vehicles were kept inside the walls of the house only if they would remain unemployed for a period longer than the abitual.

In the years following the creation of the C-32 during the Olympic Games of 1992 the area was gaining popularity and desidad people creción sonsiderablemente to the point that above all the traffic and parking became a problem. The vehicles parked within the plots became a daily practice in the area.

That's when the owners of the house, a couple with one child, they decided to automate the system of gates for vehicles since the operation off the car to open the door and back to the vehicle, plus moelsta often gave to jam in a small street entrance not too wide.

Finally chooses to replace the entire wall and the entrance doors of both vehicles and pedestrians.


Materials

The door

The door for the vehicles are made of steel pedestrian polite.

Once placed oxidise the material was left by natural means and is paired with baths salfumán. Once oxidized the oxide layer protects the material still "healthy" of the inner layers so that the maintenance, unlike the painted metal is minimal. However once achieved the desired result is a layer of varnish applied to both doors to prevent rust manchase to the house to franquearlas and pedestrians can move on the sidewalk and brush structure.


The roof

The roof is built on a reinforced concrete containment perimeter where the concrete is the same profile as the Court gives wave.

The top of the roof has two remaining light from the central longitudinal axis to the sides to avoid envalsamiento rainwater. Moreover once the concrete is curing varnish with waterproof material from the top to prevent water leaks were most likely produced by subjecting the structure to prolonged periods of rain due to its low thickness